ON3 Metro Parking Garage, Nutley, NJ
Structure Type
Stand-alone, mixed use garage
Client
Prism Capital Partners
Prism Construction Management
Architect/Engineer
Project Architect: Aztec Architects
Project Engineer: Harrison-Hamnett, P.C.
Precast Engineer: Innovative Engineering Services
Details
Part of the ON3 world-class campus being developed on the former Hoffman-La Roche pharmaceutical site, the 100-200 Metro Boulevard parking garage is a very large 7-level structure. Erection of the structure began in May 2019. With its 127,200 SF footprint, it provides 2,566 parking spaces that support two Class A Office Towers.
The structure was a design-build effort to accommodate the parking needs as well as fit within the triangular project site, requiring a distinctive combination of sawtooth steps to respect the western edge of the lot, which is adjacent to a freight rail line. Two stair and elevator towers support the adjacent office buildings, and two additional stair towers provide additional means of egress. Within the structure is an 8,000 square-foot storage area that required specialty waterproofing on the first elevated level along with three hours of fire protection.
Custom exterior spandrels include a basketweave form liner finish to give this structure a unique, one-of-a-kind appearance. This attractive pattern on the exterior provides aesthetic value to the surrounding campus and helps to counterbalance the large scale of this enormous garage.
Click here to read more about this garage in the Winter 2023 issue of Ascent Magazine.