Peckham Materials first began operations in Port Chester. The original plant was a 3 ton batch plant manufactured by Stan Steel and emissions were controlled with a wet scrubber. 13 years later, a 5 ton H&B batch plant was installed. The Peckham Road paving division ran its garage in the plant’s yard until 1991.