Samaritan Hospital Parking Garage, Troy, NY

Structure Type

Parking Structure

Client

St. Peter’s Health Partners

General Contractor

Bette & Cring, LLC

Architect/Engineer

Project Architect: Envision Architects
Project Engineer: M/E Engineering, P.C.
Precast Engineer: Innovative Engineering Services, Inc.

Details

This 4-level parking garage with approximately 575 parking spaces features a combination of brick-wrapped exterior columns and false columns. The spandrels are a combination of plain and brick-clad. The garage has both a punch-through stair tower and a main elevator/stair tower. One of the logistical challenges Dailey Precast helped to manage on this project was working at a live hospital campus during construction.